stardevelop.com Live Help Accept Decline Close
Logo
 
Construction

GJI has a dedicated team of Engineers and Technicians having vast knowledge in the field of Transmission Line and Sub Station Structures.

Although new in this region, the company has successfully constructed 400/132 kV TL Line for Dubai Electricity & Water Authority (DEWA) in Dubai with route length of 54 Kms.

GJIL is currently constructing 400 kV D/C OHTL for DEWA in Dubai with route length of 135 Kms and 400 kV S/C OHTL for Sonelgaz in Algeria with route length of 199 Kms.

Besides having skilled work force, GJI possesses the best array of modern equipments and adopts the latest innovative construction practices.


Name of the Equipment Unit Quantity
Piling Equipment Set 1
Dumpy Level Set 10
Total Station Set 5
GPS Machine Set 2
TSE Machine Set 2


GJI´s strength in this field lies in the way it easily adapts itself to the various terrains where the Lines are to be built. This easy adaptability ensures smooth and timely execution of Projects.

 
 
Designed By RSI Concepts